SR.NO. | TITLE | DATE | VIEW/DOWNLOAD |
---|---|---|---|
1 | Action to be taken to prevent water borne diseases | 05/02/2003 | |
2 | Instructional order for proper upkeep of departmental and hired tankers | 05/28/2003 |
003-Instructional oredr for proper upkeep of departmental and hired tankers |
3 | Instructional order regarding excavation work during monsoon period | 06/17/2003 |
004-Instructional order regarding excavation work during monsoon period |
4 | Instructional order reg. splitting of contracts, etc. | 06/19/2003 | |
5 | Instructional order reg. extension of time, etc. | 09/26/2003 | |
6 | Tender cases | 02/06/2004 | |
7 | Justification of rates | 02/13/2004 | |
8 | Instructional order reg. selection of material for water pipe lines | 06/14/2004 |
010-Instructional order reg. selection of material for water pipe lines |
9 | Urgent repair/replacement of water lines either through Spot Quotation of by Short Notice Tender | 07/02/2004 |
011-Urgent repairreplacement of water line either through Spot Quotation of by Short Notice Tender |
10 | Instructional order reg. proper coordination between Civil and E&M wings in respect of composite works | 07/05/2004 |
012-Instructional order reg. proper coordination between Civil and E&M |
11 | Instructional order reg. proper coordination between Civil and E&M wings in respect of composite works | 07/05/2004 |
012-Instructional order reg. proper coordination between Civil and E&M |
12 | Instructional order reg. expeditious disposal of tender cases | 07/21/2004 |
013-Instrutional order reg. expeditious disposal of tender cases |
13 | Instructional order reg. quality control, spot quotations etc | 08/27/2004 |
014-Instructional order reg. quality control, spot quotations etc |
14 | Order reg. closing of Central Tendering Cell | 11/17/2004 | |
15 | Instructional order reg. criteria for issue of tenders | 01/24/2005 | |
16 | Instructional Order reg. Public Grievance Mechanism for Replacement of manhole covers | 01/27/2005 |
017-Instructional Order reg. Public Grievance Mechanism for Replacement |
17 | Modification to instructional order dated 24.01.2005 | 01/31/2005 | |
18 | Instructional order for timely completion of work, safety measures, etc | 01/31/2005 |
019-Instructional order for timely completion of work, safety measures, etc |
19 | Instructional order reg. replacement of lost manhole covers within 24 hours | 02/09/2005 |
020-Instructional order reg. replacement of lost manhole covers within 24 hou |
20 | Violation of instructions/laid down procedure for tendering | 02/17/2005 |
021-Violation of instructions laid down procedure for tendering |
21 | Instructional order reg. tube wells | 02/25/2005 | |
22 | Centralized purchase of pumps, motors, etc for tube wells | 05/18/2005 |
023-Centralized purchase of pumps, motors, etc for tube wells |
23 | Instructional order reg. cases to be placed before the Board along with certain details | 06/10/2005 |
024-Instructional order reg. cases to be placed before the Board along with |
24 | Work permit for departmental labour working under sewerage system | 05/30/2005 |
025-Work permit for departmental labour working under sewerage system |
25 | Instructional order reg. conditional discounts | 07/18/2005 | |
26 | Instructional Order reiterating earlier orders reg. tendering, etc | 07/27/2005 |
027-Instructional Order reiterating earlier orders reg. tendering, etc |
27 | Instructional order reg. third party quality check, etc | 08/25/2005 |
028-Instructional order reg. third party quality check, etc028-Instructional |
28 | Instructional order reg. transparency in tendering | 08/26/2005 | |
29 | Circular reg. regular inspection of water mains | 09/15/2005 | |
30 | Circular reg. endorsement of work orders to Director (SDM) | 11/10/2005 |
031-Circular reg. endorsement of work orders to Director (SDM) |
31 | Implementation of workers safety norms | 11/25/2005 | |
32 | Instructional order reg. observations of CTEO | 12/21/2005 | |
33 | Circular reg. Work Advisory Committee | 12/27/2005 | |
34 | Instructional order reg. hired water tankers | 04/10/2006 | |
35 | Instructional order reg. recommendation of names of contractors specializing in laying of water/sewer mains etc | 11/21/2006 |
036-Instructional order reg. recommendation of names of contractors |
36 | Circular reg. replacement of old pipe lines, etc. | 12/28/2006 | |
37 | Circular reg. Clause 10CC | 04/03/2007 | |
38 | Circular reg. inspection of works by CE/SE | 04/24/2007 | |
39 | Circular reg. safety of workers | 02/20/2019 | |
40 | Instructional order reg. eligibility criteria for issue of tenders | 01/03/2008 |
041-Instructional order reg. eligibilty criteria for issue of tenders |
41 | Instructional order reg. pre-bid meeting | 04/24/2008 | |
42 | Circular reg. tendering limit | 05/12/2008 | |
43 | Instructional order reg. block estimates | 05/16/2008 | |
44 | Test checking of measurements | 05/28/2019 | |
45 | Inclusion of additional items in Clause 10A of conditions of contract | 06/09/2008 |
046-Inclusion of additional items in Clause 10A of conditions of contract |
46 | Instructional order reg. eligibility criteria | 07/22/2008 | |
47 | Instructional order reg. safety of workers | 10/06/2008 | |
48 | Instructional order reg. random checking of estimates by CEs and SEs | 10/23/2008 |
049-Instructional order reg. random checking of estimates by CEs and SEs |
49 | Circular reg. action required in case of no response from the firm regarding verification of documents | 05/25/2009 |
050-Circular reg. action required in case of no response from the firm |
50 | Instructional order reg. Regular inspections by Chief Engineer and Superintending Engineer | 08/09/2009 |
051-Instructional order reg. Regular inspections by Chief Engineer and Super |
51 | Instructions reg. Streamlining the process of permissions for tube wells | 02/03/2010 |
052-Instructions reg. Streamlining the process of permissions for tube wells |
52 | Instructional order reg. engagement of tankers | 02/08/2010 | |
53 | Circular reg. implementation of safety provisions | 04/05/2010 | |
54 | Circular reg. proper framing of estimates | 06/01/2010 | |
55 | Guidelines regarding installation of tube-wells/DBHP | 06/21/2010 | |
56 | Circular reg. Joint VentureCircular reg. Joint Venture | 03/11/2010 | |
57 | OM reg. P-Category contractorsOM reg. P-Category contractors | 12/24/2010 | |
58 | Approval of M/s Delhi Test House | 12/01/2011 | |
59 | Clearance from the Labour officer on completion of works | 02/14/2011 |
060-Clearance from the Labour officer on completion of works |
60 | Preparation of estimate for procurement/works and reasonability of rates | 03/01/2011 |
061- Preparation of estimate for procurementworks and reasonability of rates |
61 | Issue of Notification regarding sewer lines laid in a colony | 03/07/2011 |
062-Issue of Notification regarding sewer lines laid in a colony7-3-2011 |
62 | Instructional order reg. use of HDPE pipes, etc. in sewerage works | 03/08/2011 |
063-Instructional order reg. use of HDPE pipes, etc. in sewerage works |
63 | Diversion of funds by DJB as pointed out in C.A.G Report for the year ending March 2009 | 03/10/2011 |
064-Diversion of fund by DJB as pointed in C.A.G Report for the year ended |
64 | Policy decision on maintenance of common ferrules and sewer manholes | 06/28/2011 |
065-Policy decision on maintenance of common ferrules and sewer manholes |
65 | Inclusion of nearest material in materials covered under Clause 10CA of conditions of contract | 06/29/2011 |
066-Inclusion of nearest material in materials covered under Clause 10CA of |
66 | Partial Modification of I. O. reg 250-400 mm dia sewer line | 06/30/2011 |
067-Partial Modification of I. O. reg 250-400 mm dia sewer line |
67 | Circular reg. 10 year DLP for sewerage projects | 07/13/2011 | |
68 | Instructions reg. installation of submersible pumps in bore wells | 07/29/2011 |
069-Instructions reg. installation of submersible pumps in bore wells |
69 | Boring/reborings of tube wells in South and South West Districts | 01/08/2011 |
070-Boringreborings of tube wells in South and South West Districts |
70 | Circular reg. fresh approval of Board in case of substantial change in original estimate | 08/16/2011 |
071-Circular reg. fresh approval of Board in case of substantial change in |
71 | Instructions reg. selection of suitable sites for installing tube wells | 08/23/2011 |
072-Instructions reg. selection of suitable sites for installing tube wells |
72 | Adoption of CPWD DSR 2012 in DJB | 03/01/2012 | |
73 | Instructional order reg. standardized general, technical & financial eligibility criteria | 04/24/2012 |
074-Instructional order reg. standardized general, technical & financial |
74 | Instructional order reg. standardized general, technical & financial eligibility criteria-2 | 04/30/2012 |
075-Instructional order reg. standardized general, technical & financial |
75 | Circular reg. transparent and predictable bidding environment. Reverse Auction | 08/16/2012 |
076_1-Circular reg. transparent and predictable bidding environment. |
76 | Instructional Order reg. safety equipment/measures for workers working in hazardous conditions | 08/23/2012 |
077-Instructional Order reg. safety equipment measures for workers working |
77 | Instructions reg. Measures for prevention of fatal accidents of small children due to their falling into abandoned orewells and Tube wells | 08/23/2012 |
078-Instructions reg. Measures for prevention of fatal accidents of small |
78 | Instructional order reg. road restoration work | 09/10/2012 | |
79 | Adoption of DSR 2012 in place of DSR2007 for capital works in NCT of Delhi | 09/12/2012 |
080-Adoption of DSR 2012 in place of DSR2007 for capital works in NCT |
80 | Instructions reg. Filling of water tankers by the outside agencies | 11/20/2012 |
081-Instructions reg. Filling of water tankers y the outside agencies |
81 | Circular regarding excise duty component | 12/14/2012 | |
82 | Constitution of Technical Committee | 02/19/2013 | |
83 | Instructional order reg. Precautions to be observed in functioning of the Water emergency/Filling Points and water tankers | 04/09/2013 |
084-Instructional order reg. Precautions to be observed in functioning of the |
84 | Order regarding barricading and caution boards | 04/23/2013 | |
85 | Circular regarding P-Category contractors | 05/31/2013 | |
86 | Circular for providing laptops to AEs and JEs | 08/05/2013 | |
87 | Circular reg. clarification w.r.t. 3(g) of chapter-II of tariff & Metering regulations 2012 | 10/28/2013 |
088-Circular reg. clarification w.r.t. 3(g) of chapter-II of tariff & Metering |
88 | Circular reg. proper scrutiny of estimates before according Technical Sanction | 12/18/2013 |
089-Circular reg. proper scrutiny of estimates before according Technical |
89 | Instructional Order reg. proper utilisation of super suckers and Recyclers | 02/19/2014 |
090-Instructional Order reg. proper utilisation of super suckers and Recyclers |
90 | Installation of filling points at STPs | 02/26/2014 | |
91 | Instructional order reg. safety of workers | 03/11/2014 | |
92 | Instructional Order reg. desilting of sewers | 03/25/2014 | |
93 | Circular reg. sourcing of pipes | 04/07/2014 | |
94 | Instructional order reg. proper information to concern EE(E&M) prior to taking up repair work on water lines by the maintenance staff | 04/22/2014 |
095-Instructional order reg. proper information to concern EE(E&M) prior to |
95 | Reg. exemption of water tankers and sewer cleaning machines for plying in 'No Entry' areas | 04/29/2014 |
096-Reg. exemption of water tankers and sewer cleaning machines for plying |
96 | Enhancement of tendering limit of Civil contractors registered in DJB | 05/05/2014 |
097-Enhancement of tendering limit of Civil contractors registered in DJB |
97 | Instructional order reg. handing over-taken over of sewerage networkInstructional order reg. handing over-taken over of sewerage network | 05/05/2019 |
098-Instructional order reg. handing over-taken over of sewerage network |
98 | Circular reg. Recyclers | 05/05/2014 | |
99 | Approval of M/s Delhi Test House 2014 | 05/19/2014 | |
100 | Instructions reg. Weekly/daily report on functioning of tube wells | 05/27/2014 |
101-Instructions reg. Weeklydaily report on functioning of tube wells |
101 | Instructions reg. precautions to be taken during monsoon season to prevent water borne diseases | 06/10/2014 |
102-Instructions reg. precautions to be taken during monsoon season to |
102 | Instructional Order reg. NGT concern on cutting of tree roots by DJB during excavation works | 06/13/2014 |
103-Instructional Order reg. NGT concern on cutting of tree roots by DJB |
103 | Instructional Order reg. Nodal officer for disposal of NHRC cases | 06/19/2014 |
104-Instructional Order reg. Nodal officer for disposal of NHRC cases |
104 | Instructions reg. precautions to be taken for excavations to protect other utilities | 07/04/2014 |
105-Instructions reg. precautions to be taken for excavations to protect other |
105 | Instructions reg. rates of Pig iron from market for high value pipe work tenders | 07/18/2014 |
106-Instructions reg. rates of Pig iron from market, for high value pipe work |
106 | Regarding formation and monitoring of DMAs to reduce NRW in each maintenance zone | 07/31/2014 |
107-Regarding formation and monitoring of DMAs to reduce NRW in each |
107 | Circular reg. use of fly ash, etc | 12/08/2014 | |
108 | Instructions reg. road cutting works | 08/25/2014 | |
109 | Circular reg. CPHEEO Manual | 08/26/2014 | |
110 | Instructional order reg. Call Centre | 09/24/2014 | |
111 | Simplified procedure for approval of Bulk Water supply Schemes in the Planning Cell | 11/07/2014 |
112-Simplified procedure for approval of Bulk Water supply Schemes in the |
112 | Circular reg. sewerage schemes & estimates prepared by consultants/ Division | 11/10/2014 |
113-Circular reg. sewerage schemes & estimates prepared by consultants |
113 | Instructional Order reg. Routing of estimates through STC | 11/28/2014 |
114- Instructional Order reg. Routing of estimates through STC |
114 | Instructional Order reg. Sewerage side to seek separate rates for trenchless works on item rate basis and remaining BOQ on percentage basis | 11/28/2014 |
115-Instructional Order reg. Sewerage side to seek separate rates for trenchl |
115 | Circular reg. excavation under proper supervision with due intimation to agencies concerned | 12/02/2014 |
116-Circular reg. excavation under proper supervision with due intimation to |
116 | Guidelines regarding replacement of House Service Connection in Delhi | 12/08/2014 |
117-Guidelines regarding replacement of House Service Connection in Delhi |
117 | Enhancement of tendering limit of Civil contractors registered in DJB | 12/26/2014 |
118-Enhancement of tendering limit of Civil contractors registered in DJB |
118 | Specifications for bulk flow & pressure measuring system for Water Auditing | 01/08/2015 |
119-Specifications for bulk flow & pressure measuring system for Water Audi |
119 | Circular reg. maps issued by Mapping Cell | 01/19/2015 | |
120 | Advisory to make the command area of UGR & BPS hydraulically discreet | 01/28/2015 |
121-Advisory to make the command area of UGR & BPS hydraulically discr |
121 | Instructional Order reg. precautions for safety of trees to be included in the bid document | 02/05/2015 |
122-Instructional Order reg. precautions for safety of trees to be |
122 | Circular reg. enlistment rules of contractors | 03/04/2015 | |
123 | Circular reg. enlistment rules of contractors-amended | 03/05/2015 | |
124 | Establishment of Water Regulatory Authority in the State | 04/09/2015 |
125-Establishment of Water Regulatory Authority in the State |
125 | Instructional order reg. Tankers, for following scheduled trips | 04/29/2015 |
126-Instructional order reg. Tankers, for following scheduled trips |
126 | Reg. NGT's orders in respect of burning of tree leaves, etc | 05/11/2015 |
127-Reg. NGT's orders in respect of burning of tree leaves, etc |
127 | Instructional order reg. MB entry of work done, etc | 05/13/2015 | |
128 | Reg. NGT's orders in respect of burning of tree leaves, etc | 05/21/2015 |
129-Reg. NGT's orders in respect of burning of tree leaves, etc 2 |
129 | Circular reg. procurement of materials as per specifications | 05/25/2015 |
Circular reg. procurement of materials as per specifications |
130 | Instructional order reg. road restoration work | 06/15/2015 | |
131 | Estimation of average daily water demand for approval of Bulk water supply schemes in Planning Cell | 08/24/2015 | |
132 | Rates for supply of treated effluent | 09/15/2015 | |
133 | Instructional order reg. Wastage of water from Water tankers | 09/16/2015 |
134-Instructional order reg. Wastage of water from Water tankers |
134 | Standard Operating practices for execution of work | 11/27/2015 |
135-Standard Operating practices for execution of work 27-11-2015 |
135 | Circular reg. P-category contractors | 01/06/2016 | |
136 | Guidelines for use of MS pipes (lined and coated) | 01/22/2016 | |
137 | Estimation of average daily water demand for approval of Bulk water supply schemes in Planning Cell-Amendment No.1 | 02/02/2016 |
138-Estimation of average daily water demand for approval of Bulk water sup |
138 | Approved/empanelled list of 15mm size IS-779 multijet, inferential type, class-B with IP 68 protection meters | 02/19/2016 |
139-_Approved empanelled list of 15mm size IS-779 multijet, inferential typ |
139 | Instructional order reg. regular monitoring of projects at CE/SE/EE level | 02/23/2016 |
140-Instructional order reg. regular monitoring of projects at CE SE EE level |
140 | Instructions reg. CCTV provision in supersucker not mandatory | 03/02/2016 |
141-Instructions reg. CCTV provision in supersucker not mandatory |
141 | Circular regarding WC, CP & OH, labour cess, VAT | 03/03/2016 | |
142 | Instructions reg. regular monitoring of projects at CE level | 03/08/2016 |
143-Instructions reg. regular monitoring of projects at CE level |
143 | Circular reg. water supply and sewerage infrastructure fund charges | 03/11/2016 |
144-Circular reg. water supply and sewerage infrastructure fund charges |
144 | Guidelines on Rain Water Harvesting-Amendments | 03/18/2016 | |
145 | Instructions reg. cleaning and desilting of sewer lines in all authorized/unauthorized & slums areas | 03/18/2016 |
146-Instructions reg. cleaning and desilting of sewer lines in all authorizedun |
146 | Instructional order reg.missing manhole covers | 04/06/2016 | |
147 | Reg. recovery of Infrastructure Fund Charges | 04/05/2016 | |
148 | Committee for conducting performance audit of STPs | 05/25/2016 | |
149 | Instructional Order reg. Water distribution measures during Summers of 2016 | 05/31/2016 |
150-Instructional Order reg. Water distribution measures during Summ |
150 | Circulrar reg. data base in respect of maintenance contracts | 06/02/2016 |
151-Circular reg. data base in respect of maintenance contracts |
151 | Instructional order reg. Proper utilisation of newly inducted SS water tankers | 06/13/2016 |
152-Instructional order reg. Proper utilisation of newly inducted SS water tan |
152 | Circular reg. tenders for the works using trenchless technology | 07/01/2016 |
153-Circular reg. tenders for the works using trenchless technology |
153 | Circular reg. Increase of participants in tenders to expedite the installation and commissioning of tube wells | 05/07/2016 |
154-Circular reg. Increase of participants in tenders to expedite the installati |
154 | Circular reg. Decisions for executing works | 07/21/2016 | |
155 | Instructions reg. guidelines on anti-corruption issues | 07/25/2016 | |
156 | Instructional order reg. pictorial representation of project before CEO | 07/27/2016 |
157-Instructional order reg. pictorial representation of project before CEO |
157 | Use of recycled products from construction and demolition waste (Govt. Notification) | 07/27/2016 |
158-Use of recycled products from construction and demolition waste (Govt. |
158 | Instructions for providing outfall arrangement while carrying out internal sewer line works | 08/12/2016 |
159-Instructions for providing outfall arrangement while carrying out internal |
159 | Instructions reg. acceptance of BG submitted by bidders | 09/26/2016 | |
160 | Circular eg. Water and sewer connections in basements | 09/27/2016 | |
161 | Instructional Order reg. use if treated effluent for reducing air pollution | 11/07/2016 |
162-Instructional Order reg. use if treated effluent for reducing air pollution Re |
162 | Circular reg. water supply and sewerage infrastructure fund charges-clarifications | 11/10/2016 | |
163 | Instructional order reg. submission of certain documents exemption to DJB registered contractors Instructional order reg. submission of certain documents exemption to DJB registered contractors | 12/06/2016 |
164-Instructional order reg. submission of certain documents exemption to |
164 | Instructional Order for streamlining the procedure of re-boring of tube-wellsInstructional Order for streamlining the procedure of re-boring of tube-wells | 12/21/2016 |
165-Instructional Order reg. Stream line the procedure of re-boring of tube-wells |
165 | Instructional Order reg. Publicity of NITs | 12/27/2016 | |
166 | Instructional order regarding safety of workers | 08/09/2017 | |
167 | Instructional Order reg. Safety of workers and implementation of PEMS Act and their rehabilitation Rule, 2013. | 08/30/2017 |