S.NO | HEAD LINES | DATE | UPLOAD FILES |
---|---|---|---|
1 | Corrigendum of Expression Of Interest’ (EOI) from the agencies to provide/undertake Execution for the work of “Rehabilitation and up-gradation of Sludge Digesters at various STPs of DJB and conversion of Bio- Gas generated from sludge from these bio... | 31/01/22 | Corrigendum_EOI.pdf |
2 | Corrigendum of Expression Of Interest’ (EOI) from the agencies to provide/undertake Execution for the work of “Rehabilitation and up-gradation of Sludge Digesters at various STPs of DJB and conversion of Bio- Gas generated from ... | 12/01/22 | EOI_Corrigendum_120120211.pdf |
3 | Applications are invited from eligible candidates for engagement of following manpower in yAMUNA ACTION PLAN-III | 05/01/22 | EOI FOR PC AND CM.pdf |
4 | Selection of Social Media Management Agency to execute Online Reputation Management work using Digital Tools anong with Grievances Redressal for DJB | 07/12/21 | EOI.pdf |
5 | Expression Of Interest’ (EOI) from the agencies to provide/undertake Execution for the work of “Rehabilitation and up-gradation of Sludge Digesters at various STPs of DJB and conversion of Bio- Gas generated from sludge from these bio Digesters and also | 07/12/21 | Digesters Rehab-CNG.pdf |
16 | Expression of Intrest regarding 250 Kmof Trunk sewer pipeline network across Delhi with pipe diameter above 900 mm. | 06/12/21 | Dec 6, Doc 1.pdf |
7 | Expression of Intrest regarding Dwarka Water Works intends to execute the work of Design, Build, Installation, Testing and Commissioning of 20 MGD WTP. | 02/08/21 | EOI_31072021.pdf |
8 | Corrigendum and addendum No. 6 of Pkg-4, improvement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA . | 16/07/21 | Corrigendum No. 6 Pkg 4.PDF |
9 | Corrigendum and Addendum No. 6 of Pkg-3, improvement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA . | 16/07/21 | Corrigendum No. 6 Pkg 3.PDF |
10 | Corrigendum Addeendum No. 6 of Pkg- 2, Improvement of Water Supply System including Operation and maintenance of Transmission and Distribution Pipes, Pumping Stations, Service Connection and Consumer Meters with DMA formation .... | 16/07/21 | Corrigendum No. 6 Pkg 2.PDF |
11 | Corrigendum and addendum No. 5 of Pkg-4, improvement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA . | 14/07/21 | Corrigendum No. 5 Pkg 4.PDF |
12 | Corrigendum and Addendum No. 5 of Pkg-3, improvement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA . | 14/07/21 | Corrigendum No. 5 Pkg 3.PDF |
13 | Corrigendum Addeendum No. 5 of Pkg- 2, Improvement of Water Supply System including Operation and maintenance of Transmission and Distribution Pipes, Pumping Stations, Service Connection and Consumer Meters with DMA formation .... | 14/07/21 | Corrigendum No. 5 Pkg 2.PDF |
14 | Corrigendum and addendum No. 4 of Pkg-4, improvement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA . | 13/07/21 | Corrigendum No. 4 Pkg 4.PDF |
15 | Corrigendum and Addendum No. 4 of Pkg-3, improvement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA . | 13/07/21 | Corrigendum No. 4 Pkg 3.PDF |
16 | Corrigendum Addeendum No. 4 of Pkg- 2, Improvement of Water Supply System including Operation and maintenance of Transmission and Distribution Pipes, Pumping Stations, Service Connection and Consumer Meters with DMA formation .... | 13/07/21 | Corrigendum No. 4 Pkg 2.PDF |
17 | Corrigendum Addeendum No. 3 of Pkg- 2, Improvement of Water Supply System including Operation and maintenance of Transmission and Distribution Pipes, Pumping Stations, Service Connection and Consumer Meters with DMA formation .... | 05/07/21 | Package 2_ 02.07.2021.pdf |
18 | Corrigendum and addendum No. 3 of Pkg-4, lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA ... | 05/07/21 | Package-4, Pre Bid Replies and C&A no. 03.pdf |
19 | Corrigendum and Addendum No. 3 of Pkg-3, lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA ... | 05/07/21 | Package-3, Pre Bid Replies and C&A no. 03.pdf |
20 | Corrigendum addendum and pre-bid reply of Pkg-4, lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA ... | 16/06/21 | Pakg-4 C&A).PDF |
21 | Corrigendum Addendum and Pre-bid reply of Pkg-3, lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA ... | 16/06/21 | Pakg-3 C&A).PDF |
22 | Corrigendum Addeendum and pre-bid reply of Pkg- 2, Improvement of Water Supply System including Operation and maintenance of Transmission and Distribution Pipes, Pumping Stations, Service Connection and Consumer Meters with DMA formation .... | 16/06/21 | Pakg-2 C&A).PDF |
23 | Corrigendum of Pkg-4, lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA formation and NRW Reduction in Chandrawal WTP... | 07/05/21 | Corrigendum Pkg-4 |
24 | Corrigendum of Pkg-3, lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA formaiion and NRW Reduction in Chandrawal WTP... | 07/05/21 | Corrigendum Pkg-3 |
25 | Corrigendum of Pkg- 2, Improvement of Water Supply System including Operation and maintenance of Transmission and Distribution Pipes, Pumping Stations, Service Connection and Consumer Meters with DMA formation and NRW Reduction in Chandrawal WTP.... | 07/05/21 | Corrigendum Pkg-2 |
26 | lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA formation and NRW Reduction in Chandrawal WTP Command Area, Pkg-4, ( East Zone | 23/04/21 | NIT NO-03(2021-22) 1560-1591.PDF Package-4, Volume-I.pdf Package-4, Volume-II.pdf Package-4, Volume-III.pdf Package-4, Volume-IV.pdf Corrigendum Pkg-4 |
27 | lmprovement of Water Supply System including Operation and maintenance of Transmission & Distribution Pipes, Pumping Stations, Service Connections and Consumer Meters with DMA formaiion and NRW Reduction in Chandrawal WTP Command Area, Pkg-3, ( Central Zo | 23/04/21 | NIT NO-02(2021-22) 1528-1559.PDF Package-3, Volume-I.pdf Package-3, Volume-II.pdf Package-3, Volume-III.pdf Package-3, Volume-IV.pdf Corrigendum Pkg-3 |
28 | Improvement of Water Supply System including Operation and maintenance of Transmission and Distribution Pipes, Pumping Stations, Service Connection and Consumer Meters with DMA formation and NRW Reduction in Chandrawal WTP Command Area, Pkg-2 (West Zone) | 23/04/21 | NIT Package-2, Volume-I.pdf Package-2, Volume-II.pdf Package-2, Volume-III.pdf Package-2, Volume-IV.pdf Corrigendum pkg-2 |
29 | Expression of Intrest Delhi Jal Board, Wazirabad Water Works is interested to execute the work of Design, Installation, Testing and Commissioning of 60 MGD capacity Ammonia Removal Plant (up to 4 ppm) with O&M at Wazirabad/Chandrawal Water Works. | 26/03/21 | Expression of lnterest |
30 | Corrigendum 2, of Expression of Intrest /Consent invited from the register Contractor of DJB for empanelment under SE (Civil) maintance Circle for implimentation of Rate Contract System. | 19/02/21 | EOI_Corri_2_Enlisment.pdf |
31 | Corrigendum of Expression of Intrest /Consent invited from the register Contractor of DJB for empanelment under SE (Civil) maintance Circle for implimentation of Rate Contract System. | 11/02/21 | EOI_11022021.pdf |
32 | Corrigendum of Selection of Partner NGOs to carry out Public Participation, Advocacy and School Outreach Programme under Public Outreach Component for YAP-III, in specified Region of Delhi. | 08/02/21 | EOI for empanelment of NGOs.pdf |
33 | Expression of Intrest /Consent invited from the register Contractor of DJB for empanelment under SE (Civil) maintance Circle for implimentation of Rate Contract System. | 03/02/21 | EOI_CE(DR)P-I_03022021.pdf |
34 | Selection of Partner NGOs to carry out Public Participation, Advocacy and School Outreach Programme under Public Outreach Component for YAP-III, in specified Region of Delhi. | 22/01/21 | EOI_22012021.pdf |
35 | Selectio of Patner Public Relation (PR) Agency to carry out media tracking and analysis, and assist DJB in handling, polices and programme to the public at large under YAP-III PR component, at both macro and micro level. | 22/12/20 | EOI_PR.pdf |
36 | Corrigendum No. 10 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 25/08/20 | Corrigendum No.10 withdrawn.pdf |
37 | Corrigendum of Selection of Agency for Security Audit of Revenue Management System 2.0 Application of Delhi Jal Board. | 04/08/20 | Corrigendum 1- RMS 2.0 Security Audit.pdf |
38 | Selection of Agency for Security Audit of Revenue Management System 2.0 Application of Delhi Jal Board. | 17/07/20 | Final RFP for Security Audit_DOR.pdf |
39 | Corrigendum No. 9 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 14/07/20 | Corrigendum No. 9 |
40 | Corrigendum No. 8 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 16/06/20 | Corrigendum No. 8 |
41 | Providing of Disinfection facility in the Existing Wastewater Treatment Plants in Delhi under DJB. | 29/05/20 | EOI |
42 | Corrigendum No. 7 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 18/05/20 | Corrigendum No 7 |
43 | Corrigendum No. 1 of Providing Consultancy services for Insitu Treatment of sub drains falling in Najafgarh and supplementary drain in Delhi y Geobag's-Ozonatation. | 20/04/20 | Corrigendum No. 1 |
44 | Providing Consultancy services for Insitu Treatment of sub drains falling in Najafgarh and supplementary drain in Delhi y Geobag's-Ozonatation. | 16/04/20 | EOI of Consultancy services |
45 | Corrigendum No. 6 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 16/04/20 | Corrigendum No.6 |
46 | Corrigendum No. 5 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 27/03/20 | Corrigendum No. 5 |
47 | Corrigendum No. 4 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 16/03/20 | Corrigendum No. 4 |
48 | Clarifications to bidder queries and Corrigendum no. 3 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 10/02/20 | Corrigendum No. 3 Replies & Corrigendum_Addendum |
49 | Corrigendum No 2 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 07/02/20 | Corrigendum no. 2 |
50 | Corrigendum No 1 of DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 19/12/19 | Corrigendum No.1 pkg-4 |
51 | DWSIIP/04 : Transmission System improvement and Construction of Clear Water Reservoirs & Pumping Stations for Wazirabad WTP Command area including SCADA & Instrumentation. | 29/11/19 | NIT No 01 2019-20 Volume 1 - Technical Bid Volume 2 - Standard Specifications Volume 3 - Particular Specification.pdf Volume 4 - Drawing Volume 5 QA QC and Safety Manual Volume 6 - Price Bid IFB DWSIIP 04 |
52 | Pre Bid Reply of Consultancy services for carrying out Hydraulic Modeling and Preparation of Detailed Project Report (DPR) for Creation of DMAs and ultimately reduction of NRW for improvement in consumer service level under the command area of primary | 11/10/19 | Pre Bid Reply |
53 | Corrigendum No. 6 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 4 : East Zone) | 09/10/19 | Extension of date |
54 | Corrigendum No. 5 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 4 : East Zone) | 30/09/19 | Packag 4 Corrigendum 5 |
55 | Corrigendum No. 5 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 2 : West Zone | 30/09/19 | Package 2 Corrigendum 5 |
56 | Corrigendum No. 4 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 4 : East Zone) | 23/09/19 | Corrigendum no.4 for pkg-4--777 |
57 | Corrigendum No. 4 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 2 : West Zone) | 23/09/19 | Corrigendum no.-4 for pkg-2-778 |
58 | “Consultancy services for carrying out Hydraulic Modeling and Preparation of Detailed Project Report (DPR) for Creation of DMAs and ultimately reduction of NRW for improvement in consumer service level under the command area of primary Under Ground Reserv | 20/09/19 | Consultancy services for carrying out Hydraulic Modeling and Preparation |
59 | Corrigendum No. 3 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 4 : East Zone) | 26/08/19 | Corrigendum No. 3 PKG-4 |
60 | Corrigendum No. 3 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 2 : West Zone) | 26/08/19 | coorigendum No-3 PKG-2 |
61 | Financial bids to be opened on 17.08.2019 Saturday of NIT No. 6, for the work of, “Consultancy services for carrying out Hydraulic Modeling and Preparation of Detailed Project Report (DPR) for Creation of DMAs and ultimately reduction of N | 16/08/19 | Financial Bid Notice |
62 | Corrigendum No. 2 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 4 : East Zone) | 09/08/19 | Package-4 corrigendum |
63 | Corrigendum No. 2 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 2 : West Zone) | 09/08/19 | Package-2 corrigendum No-2 |
64 | Corrigendum No. 1 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 2 : West Zone) | 30/07/19 | Extension of Dates |
65 | Corrigendum No. 1 of Improvement of water supply system by construction Rehabitation / Replacement ........(Package 4 : East Zone) | 30/07/19 | Extention of Dates |
66 | Corrigendum No.11 of NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 16/07/19 | corri 11_Reply and clearification |
67 | Corrigendum No.10 of NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 11/07/19 | Corrigendum No. 10_Extention of Dates |
68 | Corrigendum No.9 Replies and clarification of NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 02/07/19 | Corrigendum No. 9_Replies and clarification |
69 | Invitation of empanelement of the Institutions/ Firms/Agency for implementation of Rain Water Harvesting System in NCT of Delhi. | 28/06/19 | Invitation of empanelement of the Institutions/ Firms/Agency |
70 | Empanelment of renowned and professional Social Media Agiencies. | 27/06/19 | EOI for Social Media |
71 | Corrigendum No.8, NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 27/06/19 | Corrigendum No.8 |
72 | Empanelment of renowned and professional Audio-Visual agencies. | 14/06/19 | Empanelment of renowned and professional Audio-Visual agencies |
73 | Empanelment of renowned and professional Website handling Agencies | 14/06/19 | Empanelment of renowned and professional Website handling Agencies |
74 | Corrigendum No. 7, NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 11/06/19 | Corrigendum No. 7, Extension of Date and reply, of NIT 3 (Pkg-3 Central Zone), , |
75 | Improvement of water supply system by construction Rehabitation / Replacement ........(Package 2 : West Zone) | 04/06/19 | NIT No. 2 (Pkg 2) 1. Vol-I 2. Vol-II 3. Vol-III 5. Vol-V 4. Vol-IV |
76 | Improvement of water supply system by construction Rehabitation / Replacement ........(Package 4 : East Zone) | 04/06/19 | NIT No-1 (2019-20) 03.06.2019 1. Vol-I 2. Vol-II 3. Vol-III 4. Vol-IV 5. Vol-V |
77 | Corrigendum No.3 for NIT No. 6, for the work of, “Consultancy services for carrying out Hydraulic Modeling and Preparation of Detailed Project Report (DPR) for Creation of DMAs and ultimately reduction of NRW for improvement in consumer service level.. | 30/05/19 | Corrigendum No.3 for NIT No. 6 |
78 | Corrigendum No. 6, NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 29/05/19 | Corrigendum No. 6 Addendum and Prebid reply, of NIT 3 (Pkg-3 Central Zone), |
79 | Corrigendum No. 4 of NIT No. 10 DWSIIP/02: Distribution System Improvement in UGR Command Areas Punjabi Bagh (G-02), Pitampura (H-06) and Lawrence Road (H-08), Targeting Continuous Pressurized Water Supply and DMA based NRW Reduction and Providing House.. | 23/05/19 | Corrigendum No. 4 of NIT No. 10 DWSIIP/02 |
80 | Corrigendum No. 5, NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 23/05/19 | Corrigendum No. 5, of NIT 3 (Pkg-3 Central Zone), Extention of Date |
81 | Corrigendum No.2 for NIT No. 6, for the work of, “Consultancy services for carrying out Hydraulic Modeling and Preparation of Detailed Project Report (DPR) for Creation of DMAs and ultimately reduction of NRW for improvement in consumer service level.. | 17/05/19 | Corrigendum No.2 for NIT No. 6 |
82 | Corrigendum_Addendum_No. 3 of NIT No. 10 DWSIIP/02: Distribution System Improvement in UGR Command Areas Punjabi Bagh (G-02), Pitampura (H-06) and Lawrence Road (H-08), Targeting Continuous Pressurized Water Supply and DMA based NRW Reduction . ... | 13/05/19 | Corrigendum_Addendum_No._3_Reply Prebid Queries Pkg-2 |
83 | Corrigendum No.11 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 06/05/19 | Corrigendum No.11 of NIT 9- DWSIIP/01 |
84 | Corrigendum No. 2 of NIT No. 10 DWSIIP/02: Distribution System Improvement in UGR Command Areas Punjabi Bagh (G-02), Pitampura (H-06) and Lawrence Road (H-08), Targeting Continuous Pressurized Water Supply and DMA based NRW Reduction and Providing House.. | 03/05/19 | Corrigendum No. 2 of NIT No. 10 DWSIIP/02 |
85 | Corrigendum No. 1 for NIT No. 6, for the work of, “Consultancy services for carrying out Hydraulic Modeling and Preparation of Detailed Project Report (DPR) for Creation of DMAs and ultimately reduction of NRW for improvement in consumer service level.... | 30/04/19 | Corrigendum No. 1 for NIT No. 6 |
86 | Corrigendum No. 4, NIT No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 23/04/19 | Corrigendum No. 4, of NIT 3 (Pkg-3 Central Zone), Extention of Date |
87 | Corrigendum & Addendum No.10 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 22/04/19 | Corrigendum & Addendum No. 10 of NIT 9- DWSIIP/01 |
88 | Corrigendum No.9 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 15/04/19 | Corrigendum No.9 of NIT 9- DWSIIP/01 |
89 | Corrigendum No. 1 of NIT No. 10 DWSIIP/02: Distribution System Improvement in UGR Command Areas Punjabi Bagh (G-02), Pitampura (H-06) and Lawrence Road (H-08), Targeting Continuous Pressurized Water Supply and DMA based NRW Reduction and Providing House.. | 15/04/19 | Corrigendum No. 1 of NIT No. 10 DWSIIP/02 |
90 | Amended RFP for the work of, “Consultancy services for carrying out Hydraulic Modeling and Preparation of Detailed Project Report (DPR) for Creation of DMAs and ultimately reduction of NRW for improvement in consumer service level under the command area | 15/04/19 | Amended NIT Letter Amended RFP 12_04_2019 Replies to Pre-bid queries USB-01 USB-02 USB-03 USB-04 USB-05 USB-06 |
91 | Corrigendum No.8 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 08/04/19 | Corrigendum & Addendum No.8 NIT No.9 (2018-19)f NIT 9- DWSIIP/01 |
92 | Corrigendum No.7 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 05/04/19 | Corrigendum No.7 of NIT 9- DWSIIP/01 |
93 | Corrigendum & Addendum No.6 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 27/03/19 | Corrigendum No.6 of NIT 9- DWSIIP/01 Corrigendum & Addendum No. 06 of NIT 9- DWSIIP/01 Clarifications to Bidder’s Queries-2nd lot of NIT 9- DWSIIP/01 |
94 | Corrigendum No. 3 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 22/03/19 | Corrigendum No. 3, of NIT 3 (Pkg-3 Central Zone), Extention of Date |
95 | Corrigendum No.5 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 14/03/19 | Corrigendum No.5 of NIT 9- DWSIIP/01 |
96 | Request for Proposal for “Consultancy services for Preparation of Detailed Project Report (DPR), Creation of DMAs, assessment of NRW with improvement in service Level for consumers under the command area of primary Under Ground Reservoirs (UGRs) in Delhi. | 06/03/19 | NIT 06 SE(East)_Package-1 SE(North-East)_Package-2 SE(South)_Package-3 SE(South-West)_Package-4 SE(West)_Package-5 SE(North_West)_Package-6 |
97 | Corrigendum, Addendum No.4 and Bidder Quaries of NIT 9 - DWSIIP/01: Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 06/03/19 | Corrigendum and Addendum No.4 and Bidder Quaries of NIT 9- DWSIIP/01 |
98 | NIT No. 10 DWSIIP/02: Distribution System Improvement in UGR Command Areas Punjabi Bagh (G-02), Pitampura (H-06) and Lawrence Road (H-08), Targeting Continuous Pressurized Water Supply and DMA based NRW Reduction and Providing House service connections | 01/03/19 | NIT No. 10 (2018-19) Volume 1 - Technical Bid Volume 2 - Standard Specification Volume 3 - Particular Specification Volume 4 - Drawing (Part A) page 1 to 16 Volume 4 - Drawing (Part B) Page 17 to 36 Volume 4 - Drawing (Part C) Page 37 to 47 Volume 4 - Drawing (Part D) Page 48 to 60 Volume 4 - Drawing (Part E) Page 61 to 68 Volume 4 - Drawing (Part F) Page 69 to 76 Volume 4 - Drawing (Part G) Page 77 to 101 Volume 5 - QA-QC & Safety Manual Volume 6 - Price Bid |
99 | Corrigendum No. 2 for Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone). | 26/02/19 | Corrigendum No. 2, of NIT 3 (Pkg-3 Central Zone), Extention of Date |
100 | Corrigendum No.3 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 22/02/19 | Corrigendum No.3 of NIT 9- DWSIIP/01 |
101 | Corrigendum No.2 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 18/02/19 | Corrigendum No.2 of NIT 9- DWSIIP/01 |
102 | Empanelment of agencies for providing hired tankers to transportation the treated effluent from various sewage treatment plant of Delhi Jal Board. | 29/01/19 | EOI |
103 | Corrigendum No.1-Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone) | 22/01/19 | Corrigendum No.1, NIT No.3 (2018-19),(Pkg-3 Central Zone) |
104 | Corrigendum No.1 of NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 07/01/19 | Corrigendum No.1 of NIT 9- DWSIIP/01 |
105 | Improvement of Water Supply System by Const./Rehab./Replacement,Supply,Laying,Inst.,Testing, Comm. of Transmission ---water distribution in the Chandrawal WTP Command Area (Pkg-3 Central Zone) | 29/12/18 | NIT No. 03 (2018-19)/EE(Proiect)W-ll VOL I- PKG-3 VOL II- PKG-3 VOL-III-PKG-3- Part-A VOL-III-PKG-3- Part-B VOL- IV- PKG-3 VOL- V- PKG-3 |
106 | NIT 9- DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 28/12/18 | NIT-09 (2018-19) Volume 1 - Technical Bid-Part-A Volume 1 - Technical Bid-Part-B Volume 1 - Technical Bid-Part-C Volume 1 - Technical Bid-Part-D Volume 2 - Standard Specifications Volume 3 - Particular Specifications Volume 4 - Drawings-Part-A Volume 4 - Drawings-Part-B Volume 5 - Price Bid |
107 | Reply to Pre-Bid queries received in Pre- Bid meeting held on 27.11.2018 for 3rd Expression of interest (EOI) for empanellment of manufacturers of 15 mm dia water meters. | 11/12/18 | Reply to Pre-Bid queries received in Pre- Bid meeting held on 27.11.2018 |
108 | 3rd Expression of interest (EOI) for empanellment of manufacturers of 15 mm dia water meters. | 06/11/18 | 3rd Expression of interest (EOI) for empanellment of manufacturers |
109 | RFP for Study on Exploration of Fresh Water in Swarka area as well as Brackish Water in Entire Delhi. | 04/09/18 | RFP for Study on Exploration of Fresh Water |
110 | Corrigendum & Prebid of reply consultancy firm for planning, hydraulic modeling, leak detection works etc. for reduction of NRW by formation of 102 DMA in ph-I in water supply network of DJB | 29/08/18 | Corrigendum & Prebid of reply |
111 | EOI for drilling of the tube wells in Rocky and alluvial strata separately. | 27/08/18 | EOI for drilling of the tube wells |
112 | Hiring of consultancy firm for planning, hydraulic modeling, leak detection works etc. for reduction of NRW by formation of 102 DMA in phase-I in water supply network of DJB” and its O&M for 2 years. | 30/07/18 | Hiring of consultancy firm for planning |
113 | Corri 5 & Re-Invite-Design, Const., Inst., Testing, Comm. & Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 30/07/18 | Corri 5 & Re-Invite-Design |
114 | C&A 6 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). | 23/07/18 | C&A 6 |
115 | C&A 5 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). | 18/07/18 | C&A 5 of Construction of 564 MLD |
116 | Corri 4 & Re-Invite-Design, Const., Inst., Testing, Comm. & Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 18/07/18 | Corri 4 & Re-Invite-Design |
117 | Corri 2 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). | 22/06/18 | Corri 2 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package- |
118 | Corri 2 of Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 18/06/18 | Corri 2 of Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal |
119 | Corri of Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 21/05/18 | Corri of Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT |
120 | Auction Notice (2018-19) - Open Auction is hereby invited on urgent basis on behalf of the president of India, in the office of the Dy. Director (HORTI) South on 23-05-2018 at 3.00 P.M. | 21/05/18 | Auction Notice (2018-19) - Open Auction is hereby invited on urgent basis on behalf of the president of India, in the office of |
121/td> | Auction Notice (2018-19) - Open Auction is hereby invited on urgent basis on behalf of the president of India, in the office of the Dy. Director (HORTI) South on 18-05-2018 at 3.00 P.M. | 22/06/18 | Auction Notice (2018-19) - Open Auction is hereby invited on urgent basis on behalf of the president of India, in the office of |
122 | EOI Regarding Empanelment of Agencies for providing hired tanker to transportation the treated effluent from various STP DJB. | 14/05/18 | EOI Regarding Empanelment of Agencies for providing hired tanker to transportation the treated effluent from various STP DJB. |
123 | Corri 1 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). | 04/05/18 | Corri 1 of Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package- |
124 | Re-Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 02/05/18 | |
125 | Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). | 09/04/18 | Construction of 564 MLD (124 MGD) WWTP on DBO (one year DLP plus 10 years O&M) basis at Okhla under YAP-III (Package-O). |
126 | Corrigendum 19 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 05/03/18 | Corrigendum 19 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
127 | CNO.3-NIT-1-Design, Const., Inst., Testing, Comm.. & Auto.. with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units & CWMC is hereby withdrawn | CNO.3-NIT-1-Design, Const., Inst., Testing, Comm.. & Auto.. with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including U | |
128 | NIT 6-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing HSC is hereby withdrawn. | 15/02/18 | NIT 6-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Suppl |
129 | Corrigendum 18 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 15/02/18 | Corrigendum 18 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
130 | Corrigendum No.2-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 29/01/18 | Corrigendum No.2-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
131 | Corrigendum 17 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 16/01/18 | Corrigendum 17 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
132 | Re- Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 12/01/18 | Re- Invite-Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP includ |
133 | DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Connections. | 12/01/18 | DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and |
134 | Corrigendum 16 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 04/01/18 | Corrigendum 16 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
135 | EOI for the work of "Consultancy services for carrying out Hydraulic Modelling of water network on the command area of Maya Puri. | 08/12/17 | EOI for the work of "Consultancy services for carrying out Hydraulic Modelling of water network on the command area of Maya Puri |
136 | Corrigendum 15 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 08/12/17 | Corrigendum 15 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
137 | Corrigendum No. 1 of Expression of Interest for DJB in house IT System. | 07/12/17 | Corrigendum No. 1 of Expression of Interest for DJB in house IT System. |
138 | Expression of Intrest for DJB in house IT System. | 22/06/18 | Expression of Intrest for DJB in house IT System. |
139 | C & A No.3 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assisted Yamuna Action Plan Phase-III (Package R1b). | 10/11/17 | C & A No.3 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pit |
140 | Corrigendum No.3 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under YAP-III (Package K4). | 09/11/17 | Corrigendum No.3 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in |
141 | Corrigendum No. 3 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II | 02/11/17 | Corrigendum No. 3 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II |
142 | Expression of Interest | 27/10/17 | Corrigendum 14 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
143 | Corri & Adde No. 02 and Bidder's reply-DWSIIP/01:Distribution Network Improv in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Prov. HSC. | 03/10/17 | Corri & Adde No. 02 and Bidder's reply-DWSIIP/01:Distribution Network Improv in UGR Command Areas C-02 and C-03 Targeting Contin |
144 | Corrigendum 2 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assisted Yamuna Action Plan Phase-III (Package R1b). | 29/09/17 | Corrigendum 2 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at |
145 | Corrigendum 2 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assisted Yamuna Action Plan Phase-III (Package R1b). | 29/09/17 | Corrigendum 2 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at P |
146 | Corrigendum No.2 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under YAP-III (Package K4). | 29/09/17 | Corrigendum No.2 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in |
147 | Bidder Workshop-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and DMA Based NRW Reduction and Providing House Service Con | 26/09/17 | Bidder Workshop-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized W |
148 | Corrigendum 13 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 25/09/17 | Corrigendum 13 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
149 | Corrigendum No. 2 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II | 21/09/17 | Corrigendum No. 2 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II |
150 | Corrigendum 1 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at P | 18/09/17 | Corrigendum 1 to NIT 2(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at P |
151 | Corrigendum No.1 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations i | 18/09/17 | Corrigendum No.1 of NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations i |
152 | EOI for installation of flow meters for proper water auditing in DJB | 11/09/17 | EOI for installation of flow meters for proper water auditing in DJB |
153 | Corrigendum 12 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st | 07/09/17 | Corrigendum 12 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
154 | NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchme | 31/08/17 | NIT No. 3 for Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchme |
155 | NIT 2(2017-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under | 31/08/17 | NIT 2(2017-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under |
156 | Corrigendum No. 1 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II | 24/08/17 | Corrigendum No. 1 for EOI of Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II |
157 | Corrigendum o. 1-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized | 24/08/17 | Corrigendum o. 1-DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized |
158 | Expression of InterestCorrigendum 11 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st | 16/08/17 | Corrigendum 11 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
159 | DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and | 14/08/17 | DWSIIP/01:Distribution Network Improvement in UGR Command Areas C-02 and C-03 Targeting Continuous Pressurized Water Supply and |
160 | Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II | 25/07/17 | Setting up Sewage Sludge (Bio-solids) Management Facility at 40 MGD STP Rithala Phase-II |
161 | Corrigendum 10 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st | 21/07/17 | Corrigendum 10 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
162 | Expression of Interest Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. | 12/07/17 | Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. |
163 | Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. | 05/07/17 | Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. |
164 | Corrigendum 9 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta | 04/07/17 | Corrigendum 9 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta |
165 | Corrigendum 11 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT | 22/06/17 | Corrigendum 11 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT |
166 | C&A 3 to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura | 21/06/17 | C&A 3 to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura |
167 | C&A 2 to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura | 16/06/17 | C&A 2 to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura |
168 | Corrigendum 3 of Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catc | 16/06/17 | Corrigendum 3 of Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catc |
169 | Corrigendum 10 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT | 09/06/17 | Corrigendum 10 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT |
170 | Corrigendum 9 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP | 08/06/17 | Corrigendum 9 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
171 | Corrigendum 8 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta | 06/06/17 | Corrigendum 8 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta |
172 | Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. | 07/06/17 | Corrigendum of EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. |
173 | Corrigendum 2 & Replies of Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondl | 06/06/17 | Corrigendum 2 & Replies of Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondl |
174 | Corrigendum 1 to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at P | 02/06/17 | Corrigendum 1 to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at P |
175 | Corrigendum No. 1 of Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP | 29/05/17 | Corrigendum No. 1 of Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP |
176 | Prebid replies to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at | 24/05/17 | Prebid replies to NIT1(17-18) for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at |
177 | Corrigendum of -Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Stan | 23/05/17 | Corrigendum of -Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Stan |
178 | Corrigendum 8 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT | 19/05/17 | Corrigendum 8 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT |
179 | Corrigendum 7 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 16/05/17 | Corrigendum 7 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
180 | Expression of InterestCorrigendum 6 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta | 09/05/17 | Corrigendum 6 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta |
181 | EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. | 02/05/17 | EOI for the work of Operation and maintenance of 45 MGD STP at kondli i/c sludge / Residue Disposal. |
182 | Corrigendum 5 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent standards of BOD ≤10 mg/l, TSS ≤10 mg/l or better under YAP-III | 26/04/17 | Corrigendum 5 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta |
183 | Re-invite-Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Standalone | 25/04/17 | Re-invite-Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Standalone |
184 | Corrigendum 7 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP | 19/04/17 | Corrigendum 7 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
185 | EOI for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assis | 19/04/17 | EOI for P/L 1200 mm Dia. DI Rising / Pressure Main from Bharat Nagar WWPS to Common Inlet Chamber at Pitampura under JICA assis |
186 | Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under | 17/04/17 | Providing and Laying Rising/Pressure Mains of 700-900 mm dia. DI Pipes at Various Locations in Kondli WWTP Catchment Area Under |
187 | Corrigendum 4 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta | 10/04/17 | Corrigendum 4 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta |
188 | Corrigendum 3 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st | 06/04/17 | Corrigendum 3 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent st |
189 | Corrigendum 2 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta | 06/04/17 | Corrigendum 2 of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent sta |
190 | Expression of InterestPrebid reply for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP | 24/03/17 | Prebid reply for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
191 | Corrigendum for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 24/03/17 | Corrigendum for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP i |
192 | Prebid reply of EOI for Performance Based contract for leakage Detection and reduction. | 21/03/17 | Prebid reply of EOI for Performance Based contract for leakage Detection and reduction. |
193 | Revised EOI for Performance Based contract for leakage Detection and reduction. | 21/03/17 | Revised EOI for Performance Based contract for leakage Detection and reduction. |
194 | Corrigendum 2 of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". | 21/03/17 | Corrigendum 2 of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". |
195 | Corrigendum 5 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP | 20/03/17 | Corrigendum 5 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
196 | Replies to Pre-bid Queries No. 2 of Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahan | 01/03/17 | Replies to Pre-bid Queries No. 2 of Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahan |
197 | Corrigendum of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent stan | 28/02/17 | Corrigendum of Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) WWTP with effluent stan |
198 | Corrigendum of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". | 27/02/17 | Corrigendum of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". |
199 | Corrigendum 4 of Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Sta | 17/02/17 | Corrigendum 4 of Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Sta |
200 | Corrigendum 4 of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm-2100 mm dia. in Kond | 16/02/17 | Corrigendum 4 of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm-2100 mm dia. in Kond |
201 | Corrigendum 4 of Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 m | 16/02/17 | Corrigendum 4 of Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 m |
202 | Corrigendum 4 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP including Upgradation and Impl. on of Part Existing Units and CWMC. | 16/02/17 | |
203 | Cor 3 & additional Prebid Replies Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangi | 13/02/17 | Cor 3 & additional Prebid Replies Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangi |
204 | Corrigendum 3 of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm-2100 mm dia. in Kond | 10/02/17 | Corrigendum 3 of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm-2100 mm dia. in Kond |
205 | Corrigendum 3 of Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 m | 10/02/17 | Corrigendum 3 of Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 m |
206 | Corrigendum of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". | 08/02/17 | Corrigendum of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". |
207 | Corrigendum 2 of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm-2100 mm dia. in Kond | 06/02/17 | Corrigendum 2 of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm-2100 mm dia. in Kond |
208 | Corrigendum 2 of Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 m | 06/02/17 | Corrigendum 2 of Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 m |
209 | Corrigendum, Extension & Prebid Replies Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and J | 03/02/17 | Corrigendum, Extension & Prebid Replies Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and J |
210 | Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) Waste Water Treatment Plants with efflu | 03/02/17 | Rehabilitation and Up-gradation of Kondli-Ph-I (45MLD), PhII (114 MLD) & Ph-III (45 MLD) Waste Water Treatment Plants with efflu |
211 | Corrigendum 3 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP | 16/01/17 | Corrigendum 3 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
212 | Corrigendum of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". | 09/01/17 | Corrigendum of Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". |
213 | MN Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 mm to 1600 mm d | 03/01/17 | MN Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 mm to 1600 mm d |
214 | Meeting Notice of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm to 2100 mm dia. in | 03/01/17 | Meeting Notice of Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm to 2100 mm dia. in |
215 | Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". | 27/12/16 | Expression of Interest (EOI) for the work of “Performance Based Contract for Leakage Detection and Reduction". |
216 | Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Standalone Structur | 19/12/16 | Rehabilitation of sewers of sizes varying from 600mm to 1400mm Dia. in Ashok Vihar and Jahangirpuri area by Standalone Structur |
217 | Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm to 2100 mm dia. in Kondli Zone By Standalone Structural Lining Method under YAP (III). | 16/12/16 | Rehabilitation of Trunk Sewer No. 5 and Jhilmil Colony Sewer of Sizes Varying from 1600 mm to 2100 mm dia. in Kondli Zone By St |
218 | Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 mm to 1600 mm dia | 16/12/16 | Rehabilitation of Trunk Sewer No. 4, Narwana Road, Anand Vihar, Hargovind Enclave, Vikas Marg Sewers from 450 mm to 1600 mm dia |
219 | Corrigendum 2 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT | 16/12/16 | Corrigendum 2 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WT |
220 | C & A No.8 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD under | 01/12/16 | C & A No.8 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD under |
221 | C & A No.7 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD under | 15/11/16 | C & A No.7 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD under |
222 | C & A No.6 and prebid replies to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWT | 03/11/16 | C & A No.6 and prebid replies to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWT |
223 | Corrigendum 1 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP | 28/10/16 | Corrigendum 1 for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
224 | Corrigendum No.5 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD u | 19/10/16 | Corrigendum No.5 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD u |
225 | Corrigendum for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP | 30/09/16 | Corrigendum for Design, Const., Inst., Testing, Commiss and Automation with 2 yrs DNP and 14 yrs O&M of 477 MLD Chandrawal WTP |
226 | EOI for Design, Const., Inst., Testing, Commiss and Automation with 2 years DNP and 14 years O&M of 477 MLD Chandrawal WTP including Upgradation and Implementation of Part Existing Units and CWMC. | 22/09/16 | EOI for Design, Const., Inst., Testing, Commiss and Automation with 2 years DNP and 14 years O&M of 477 MLD Chandrawal WTP incl |
227 | Corrigendum No.4 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD | 20/09/16 | Corrigendum No.4 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD |
228 | Extension of interest for the work of Consultancy Services for the Hydraulic modelling of command area CT-I, CT-2, CT-3 & CT-4 | 16/09/16 | Extension of interest for the work of Consultancy Services for the Hydraulic modelling of command area CT-I, CT-2, CT-3 & CT-4 |
229 | Extension of submission of expression of interest for the work of consultancy service for carrying out the hydraulic modeling of | 16/09/16 | Extension of submission of expression of interest for the work of consultancy service for carrying out the hydraulic modeling of |
230 | Expression of Interest’ (EOI) from the consulting firms/agencies to provide consultancy services for the work of Consultancy Ser | 07/09/16 | Expression of Interest’ (EOI) from the consulting firms/agencies to provide consultancy services for the work of Consultancy Ser |
231 | Expression of Interest for engagement of Charted Accountant for preparation of Financial Statement of DJB | 02/09/16 | Expression of Interest for engagement of Charted Accountant for preparation of Financial Statement of DJB |
232 | Corrigendum No.3 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD | 19/08/16 | Corrigendum No.3 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD |
233 | EOI for the work of Consultancy services for the separation of command area of Greator Kailash, Deer park and Malviya Nagar of | 09/08/16 | EOI for the work of Consultancy services for the separation of command area of Greator Kailash, Deer park and Malviya Nagar of |
234 | Corrigendum No.2 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD under YAP (III) Project (Package R2)". | 21/07/16 | Corrigendum No.2 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD u |
235 | Tender Documents for "Design & Construction, with 2 years DNP and 14 years O&M of 477 MLD Chandrawal Water Treatment Plant incl | 15/07/16 | Tender Documents for "Design & Construction, with 2 years DNP and 14 years O&M of 477 MLD Chandrawal Water Treatment Plant incl |
236 | Corrigendum No.1 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD u | 20/06/16 | Corrigendum No.1 to NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD u |
237 | Corrigendum of EOI for Recognition of Laboratories for testing of materials being used in the works of DJB. | 11/05/16 | Corrigendum of EOI for Recognition of Laboratories for testing of materials being used in the works of DJB. |
238 | NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD under YAP (III) Proj | 11/05/16 | NIT NO. 01 (2016-17) for the work of "Rehabilitation and Up-Gradation of Rithala Phase - I WWTP of 182 MLD under YAP (III) Proj |
239 | Invitation of Expression of Interest from Consulting Firms and NGOs “Expression of interest for planning and public outreach of DJB projects”. | 09/05/16 | Invitation of Expression of Interest from Consulting Firms and NGOs “Expression of interest for planning and public outreach of |
240 | Corrigendum of Consultancy Services for the development of Supplementary Drain from Mukarba Chowk to Soor Ghat, Wazirabad, Delhi. | 26/04/16 | Corrigendum of Consultancy Services for the development of Supplementary Drain from Mukarba Chowk to Soor Ghat, Wazirabad, Delh |
241 | Consultancy Services for the development of Supplementary Drain from Mukarba Chowk to Soor Ghat, Wazirabad, Delhi. | 01/04/16 | Consultancy Services for the development of Supplementary Drain from Mukarba Chowk to Soor Ghat, Wazirabad, Delhi. |
242 | Shortlisted Consulting Firms for Project Management Consultancy for ADB Assisted Delhi Water Supply Improvement Programe Project | 18/03/16 | Shortlisted Consulting Firms for Project Management Consultancy for ADB Assisted Delhi Water Supply Improvement Programe Project |
243 | Reply to Pre-bid queries received in the pre-bid meeting held on 08.01.2016 for 2nd Expression of interest (EOI) from the manufa | 22/01/16 | Reply to Pre-bid queries received in the pre-bid meeting held on 08.01.2016 for 2nd Expression of interest (EOI) from the manufa |
244 | 2nd Expression of interest (EOI) from the manufacturers of 15 mm dia water meters. | 23/12/15 | 2nd Expression of interest (EOI) from the manufacturers of 15 mm dia water meters. |
245 | Corrigendum of Expression of Interest for sale of Bio Gas Coming out from sewerage Treatment Plant(STP) of 12+20+40MGD at Keshopur. | 03/08/15 | Corrigendum of Expression of Interest for sale of Bio Gas Coming out from sewerage Treatment Plant(STP) of 12+20+40MGD at Keshop |
246 | Expression of Interest for sale of Bio Gas Coming out from sewerage Treatment Plant(STP) of 12+20+40MGD at Keshopur. | 21/07/15 | Expression of Interest for sale of Bio Gas Coming out from sewerage Treatment Plant(STP) of 12+20+40MGD at Keshopur. |
247 | Expression of Interest is invited from Advertising Firms registered with EDMC/North DMC/SDMC or any other Govt. Department/Body for displaying Advertisement on DJB installations and Water Tankers. | 08/07/15 | Expression of Interest is invited from Advertising Firms registered with EDMC/North DMC/SDMC or any other Govt. Department/Body |
248 | Reply to Pre-bid queries for Design Construction Operation and Maintenance of E-Pios near Bus Stops at Inner & Outer Ring Road with advertisement rights. | 19/06/15 | Reply to Pre-bid queries for Design Construction Operation and Maintenance of E-Pios near Bus Stops at Inner & Outer Ring Road w |
249 | Corrigendum No.1 for EOI OF manufacturers of 15 mm dia Domestic water meters . | 08/06/15 | Corrigendum No.1 for EOI OF manufacturers of 15 mm dia Domestic water meters . |
250 | Reply to Pre-bid queries received in the pre-bid meeting held on 20.05.15,for the work from the manufacturers of 15 mm dia water meters. | 04/06/15 | Reply to Pre-bid queries received in the pre-bid meeting held on 20.05.15,for the work from the manufacturers of 15 mm dia wate |
251 | EE(C)DR.XI invites sealed competitive item rate tenders from the firms specialized in Geotechnical Investigation . | 22/05/15 | EE(C)DR.XI invites sealed competitive item rate tenders from the firms specialized in Geotechnical Investigation . |
252 | Expression of Interest is invited from suitable operator(s) for Design Construction Operation and Maintenance of E-Pios near Bus Stops at Inner & Outer Ring Road with advertisement rights. | 22/05/15 | Expression of Interest is invited from suitable operator(s) for Design Construction Operation and Maintenance of E-Pios near Bu |
253 | Delhi Jal Board invites Expression of Interest (EOI) from the manufacturers of 15 mm dia water meters as per the Delhi Jal Board specifications. | 09/05/15 | Delhi Jal Board invites Expression of Interest (EOI) from the manufacturers of 15 mm dia water meters as per the Delhi Jal Boar |
254 | EOI for Project Management Consultancy for ADB assisted Delhi Water Supply Improvement Investment Program- Project 1 in Wazirabad Water Treatment Plant Command Area. | 16/03/15 | EOI for Project Management Consultancy for ADB assisted Delhi Water Supply Improvement Investment Program- Project 1 in Wazirab |
255 | EOI for Recognition of Laboratories for testing of materials being used in the works of DJB. | 25/02/15 | EOI for Recognition of Laboratories for testing of materials being used in the works of DJB. |
256 | Corrigendum of EOI from applicants having testing laboratories for their recognition for testing of materials being used in work of DJB has been Withdrawn. | 28/01/15 | Corrigendum of EOI from applicants having testing laboratories for their recognition for testing of materials being used in wor |
257 | EOI from applicants having testing laboratories for their recognition for testing of materials being used in work of DJB. | 14/01/15 | EOI from applicants having testing laboratories for their recognition for testing of materials being used in work of DJB. |
258 | Prebid Replies of meeting 23.12.2013 for Rehabilitation of 700mm and 900mm dia. By structural CIPP lining using trenchless method at kondli WWTP catchment area under yap 3. | 07/01/14 | Prebid Replies of meeting 23.12.2013 for Rehabilitation of 700mm and 900mm dia. By structural CIPP lining using trenchless meth |
259 | Shortlisted Consulting Firms for Project Management Consultancy for ADB Assisted Delhi Water Supply Improvement Investment Program- Project-1 in Wazirabad Water Treatment Plant Command Area. | 24/12/13 | Shortlisted Consulting Firms for Project Management Consultancy for ADB Assisted Delhi Water Supply Improvement Investment Progr |
260 | Delhi Jal Board is intending to sale the Raw Bio Gas generated at as a Bi-product of Anaerobic digestion of Sewage Sludge, its Waste Water Treatment Plants to the firms interested to make its commerci | 06/12/13 | Delhi Jal Board is intending to sale the Raw Bio Gas generated at as a Bi-product of Anaerobic digestion of Sewage Sludge, its W |
261 | Rehabilitation of 700mm and 900mm dia. By structural CIPP lining using trenchless method and laying of new 800mm OD HDPE pumping mains at various locations in kondli WWTP catchment area under yap 3. | 06/12/13 | Rehabilitation of 700mm and 900mm dia. By structural CIPP lining using trenchless method and laying of new 800mm OD HDPE pumping |
262 | Clarification to EOI of Project Management Consultancy for ADB assisted Delhi Water Supply Improvement Investment Program - Project 1 in Wazirabad Water Treatment Plant Command Area. | 25/10/13 | Clarification to EOI of Project Management Consultancy for ADB assisted Delhi Water Supply Improvement Investment Program - Proj |
263 | Project Management Consultancy for ADB assisted Delhi Water Supply Improvement Investment Program - Project 1 in Wazirabad Water Treatment Plant Command Area. | 27/09/13 | Project Management Consultancy for ADB assisted Delhi Water Supply Improvement Investment Program - Project 1 in Wazirabad Wate |
264 | EOI for 3rd Party inspection services for DJB Projects. | 22/07/13 | EOI for 3rd Party inspection services for DJB Projects. |
265 | EOI to provide consultancy services for the work of "Rehabilitation of SPSs feeding to STPs at Rithala Ph-I, Kondli and Okhla and allied works to maximize utilization of above STPs ". | 17/05/13 | EOI to provide consultancy services for the work of "Rehabilitation of SPSs feeding to STPs at Rithala Ph-I, Kondli and Okhla an |
266 | Corrigendum No.3 Prequali for Rehabilitation and Up-grad of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) with effluent std. of BOD -10 mg/l ,TSS –10 mg/l or better under YAP-III | 25/02/13 | Corrigendum No.3 Prequali for Rehabilitation and Up-grad of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) w |
267 | Corrigendum No.3 for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Waste Water Treatment Plants (WWTPs) with effluent standards of BOD-10 mg/l, | 15/02/13 | Corrigendum No.3 for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Was |
268 | EOI for Selection & appointment of contractor/ Agency for controlled demolition of over head water tank, Paschim Vihar, Outer Ring Raod, Delhi | 11/02/13 | EOI for Selection & appointment of contractor/ Agency for controlled demolition of over head water tank, Paschim Vihar, Outer R |
269 | Corrigendum No.2 Prequali for Rehabilitation and Up-grad of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) with effluent std. of BOD -10 mg/l ,TSS –10 mg/l or better under YAP-III | 05/02/13 | Corrigendum No.2 Prequali for Rehabilitation and Up-grad of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) |
270 | Corrigendum for Rehabilitation of Trunk Sewer No.5 and Jhilmil Colony Sewer of sizes varying from 1600mm to 2100mm dia. in Kondli Zone by GRP structural lining method under YAP-III | 04/02/13 | Corrigendum for Rehabilitation of Trunk Sewer No.5 and Jhilmil Colony Sewer of sizes varying from 1600mm to 2100mm dia. in Kond |
271 | Corrigendum of Create Awareness and Promote Community Participation in Implementation of Rain Water Harvesting Systems in NCT of Delhi. | 31/01/13 | |
272 | Corrigendum No.2 for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Waste Water Treatment Plants (WWTPs) with effluent standards of BOD-10 mg/l, | 22/01/13 | Corrigendum No.2 for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Wast |
273 | Corrigendum No.1 Prequali for Rehabilitation and Up-grad of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) with effluent std. of BOD -10 mg/l ,TSS –10 mg/l or better under YAP-III | 09/01/13 | Corrigendum No.1 Prequali for Rehabilitation and Up-grad of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) |
274 | Expression of Interest Corrigendum No.1 for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Waste Water Treatment Plants (WWTPs) with effluent standards of BOD-10 mg/l, | 03/01/13 | Corrigendum No.1 for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Wast |
275 | Providing Consultancy Services for JICA assisted Delhi Water Supply improvement Project in Chandrawal Water Treatment Plant command area. | 27/12/12 | Providing Consultancy Services for JICA assisted Delhi Water Supply improvement Project in Chandrawal Water Treatment Plant com |
276 | Create Awareness and Promote Community Participation in Implementation of Rain Water Harvesting Systems in NCT of Delhi. | 26/12/12 | Create Awareness and Promote Community Participation in Implementation of Rain Water Harvesting Systems in NCT of Delhi. |
277 | Prequalification for Rehabilitation of Trunk Sewer No.5 and Jhilmil Colony Sewer of sizes varying from 1600mm to 2100mm dia. in Kondli Zone by GRP structural lining method under YAP-III | 10/12/12 | Prequalification for Rehabilitation of Trunk Sewer No.5 and Jhilmil Colony Sewer of sizes varying from 1600mm to 2100mm dia. in |
278 | Prequalification for Rehabilitation of Trunk Sewer No.4, Narwana Road, Anand Vihar, Hargovind Enclave & Vikas Marg Sewers of Sizes 450mm to 1600mm Dia. in Kondli Zone By CIPP Method under YAP(III) | 10/12/12 | Prequalification for Rehabilitation of Trunk Sewer No.4, Narwana Road, Anand Vihar, Hargovind Enclave & Vikas Marg Sewers of Siz |
279 | Prequalification for Rehabilitation and Up-gradation of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) with effluent standards of BOD -10 mg/l ,TSS –10 mg/l or better under YAP-III | 22/11/12 | Prequalification for Rehabilitation and Up-gradation of Kondli - Ph I ,II & III (WWTP) and Rithala - Ph I (182 MLD) (WWTP) with |
280 | Prequalification for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Waste Water Treatment Plants (WWTPs) with effluent standards of BOD-10 mg/l, | 09/11/12 | Prequalification for Rehabilitation and Up-gradation of Okhla - Phase II (55 MLD), Phase III (205 MLD) & Phase IV (168 MLD) Was |
281 | REPLY TO PREBID QUERIES FOR REHABILITATION OF TWIN RISING/PUMPING MAINS OF 1100MM DIA BY CIPP STRUCTURAL LINING METHOD UNDER YAP(III) | 31/10/12 | REPLY TO PREBID QUERIES FOR REHABILITATION OF TWIN RISING/PUMPING MAINS OF 1100MM DIA BY CIPP STRUCTURAL LINING METHOD UNDER YAP |
282 | PREBID QUERIES FOR REHABILITATION OF SEWERS OF SIZES VARYING FROM 600MM TO 1400MM DIA AND ii)REHABILITATION OF TWIN RISING/PUMPING MAINS OF 1100MM DIA BY CIPP STRUCTURAL LINING METHOD UNDER YAP(III) | 26/10/12 | PREBID QUERIES FOR REHABILITATION OF SEWERS OF SIZES VARYING FROM 600MM TO 1400MM DIA AND ii)REHABILITATION OF TWIN RISING/PUMP |
283 | EOI FOR i) REHABILITATION OF SEWERS OF SIZES VARYING FROM 600MM TO 1400MM DIA AND ii)REHABILITATION OF TWIN RISING/PUMPING MAINS OF 1100MM DIA BY CIPP STRUCTURAL LINING METHOD UNDER YAP(III) | 04/10/12 | EOI FOR i) REHABILITATION OF SEWERS OF SIZES VARYING FROM 600MM TO 1400MM DIA AND ii)REHABILITATION OF TWIN RISING/PUMPING MAINS |
284 | Corrigendum No.-4 -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related associated/ allied appurtenant works, rehabilitation works . | 12/09/12 | Corrigendum No.-4 -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other rel |
285 | Prebid Reply -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related associated/ allied appurtenant works, rehabilitation works . | 10/09/12 | Prebid Reply -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related |
286 | Minutes of Clarification Meeting to Invitation for Prequalification for Construction of New Okhla Phase-I Waste Water Treatment Plant (WWTP) of 136 MLD. | 30/08/12 | |
287 | Corrigendum No.-3 -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related associated/ allied appurtenant works, rehabilitation works . | 21/08/12 | Corrigendum No.-3 -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other rela |
288 | Corrigendum No.-2 -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related associated/ allied appurtenant works, rehabilitation works . | 16/08/12 | Corrigendum No.-2 -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other rela |
289 | Pre bid query reply and addendum -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, W/Mains, T/Sewer etc. and other related associated/ allied appurtenant works, rehabilitation works . | 14/08/12 | Pre bid query reply and addendum -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, W/Mains, T/Sewer etc. and oth |
290 | EOI_Invitation for Pre Qualification | 08/08/12 | EOI_Invitation for Pre Qualification |
291 | Corrigendum -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related associated/ allied appurtenant works, rehabilitation works on DBO Basis. | 08/08/12 | Corrigendum -Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related a |
292 | EOI for "Const. of New Okhla Ph-I WWTP of 136 MLD With effiuent standards of BOD-10 Mg/L,TSS-10Mg/L or better and power generation on turnkey basis and then demolition of existing Ph-I WWTP under YAP3 | 23/07/12 | EOI for "Const. of New Okhla Ph-I WWTP of 136 MLD With effiuent standards of BOD-10 Mg/L,TSS-10Mg/L or better and power generat |
293 | EOI for work of supply Installation ,Testing and Commissioning of one number Sewage Submersible Pump at Ghonda Ph.II SPS. at office of (SDW)XIV. has been cancelled. | 13/07/12 | EOI for work of supply Installation ,Testing and Commissioning of one number Sewage Submersible Pump at Ghonda Ph.II SPS. at off |
294 | Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related associated/ allied appurtenant works, rehabilitation works on DBO Basis. | 28/06/12 | Pre-qualification of firms for Const of WTPs, STPs, UGRs, SPSs, Water Mains, Trunk sewers etc. and other related associated/ all |
395 | Pre Bid reply and extention of submission date for Expression of Intrest for Setting Up Decentralized drinking water pilot plants in Sawda Ghevra and other areas of Delhi at office of EE(PR)-W-VIII. | 20/06/12 | Pre Bid reply and extention of submission date for Expression of Intrest for Setting Up Decentralized drinking water pilot plan |
296 | Expression of Intrest at office of EE(SDW)-I ,Kiloskari SPS Jal vihar Lajpat Nagar N Delhi 110024. | 08/06/12 | Expression of Intrest at office of EE(SDW)-I ,Kiloskari SPS Jal vihar Lajpat Nagar N Delhi 110024. |
297 | Expression of Intrest for Setting Up Decentralized drinking water pilot plants in Sawda Ghevra and other areas of Delhi at office of EE(PR)-W-VIII. | 18/05/12 | Expression of Intrest for Setting Up Decentralized drinking water pilot plants in Sawda Ghevra and other areas of Delhi at offic |
298 | Expression of Intrest for rehabilitie Sludge Digesters, Gas Holder & Sludge drying Beds of 20 MGD STP At Pappan Kalan. at office of EE (P)SR)-II. | 07/05/12 | Expression of Intrest for rehabilitie Sludge Digesters, Gas Holder & Sludge drying Beds of 20 MGD STP At Pappan Kalan. at office |
299 | Expression of Intrest for Deodorization of 23 MLD sewage treatment plant at Kapeshera. | 25/04/12 | Expression of Intrest for Deodorization of 23 MLD sewage treatment plant at Kapeshera. |
300 | Expression of InterestAuction of condemned Govt. Vehicles(Gypsy). | 09/02/12 | Auction of condemned Govt. Vehicles(Gypsy). |
301 | Re-Invite Operator-cum-Distributor for processing & Packaging of drinking water, its Distribution, Marketing & Selling and the Maintenance of the Bottling Plant at Greater Kailash-I, New Delhi-110 048 | 02/06/12 | Re-Invite Operator-cum-Distributor for processing & Packaging of drinking water, its Distribution, Marketing & Selling and the M |