Sewer Connection

Home/ Customer Section/ Sewer

CONSUMER SECTION

1.WHERE TO APPLY

An applicant may download the application form from website or obtain the application form from any ZRO / ZE Office.

Before submitting the field application form Delhi, Water and Sewer (Tariff and Metering) regulation’s 2012 may be referred to avoid any inconvenience. These regulations are available to DJB website. Complete application form can be submitted to concern ZRO office, for which receipt should be taken.

2. Documents required for a new sewer connection under various categories.

TYPE OF COLONY DOCUMENTS REQUIRED
(A) Approved Colonies Proof of occupancy: Attested copy of ration card/Election card/any other valid document Attested copy of sanctioned plan of building Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney ------

 

------

 

(B) Resettlement Colonies/ Urban Villages/ 
Unauthorised / Regularised Colonies
Proof of occupancy: Attested copy of ration card/Election card/any other valid document/ 
Proof of occupancy: Attested copy of ration card/Election card/any other valid document

 

Attested affidavit as per prescribed proforma/ 
Attested affidavit as per prescribed proforma
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney/ 
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney
---- -----
(C)

 

Rural Villages Proof of occupancy: Attested copy of ration card/Election card/any other valid document Attested affidavit as per prescribed proforma Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney Lal Dora certificate Attested affi-davit showing habitation in Rural area for the last over 20 years
(D)

 

Commercial Category Proof of occupancy: Attested copy of ration card/Election card/any other valid document Attested affidavit as per prescribed proforma Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney Attested copy of Trade License for repairing/ manufacturing unit Certificate of activities in commercial area & NOC from DPCC in Case of restaurants, Sweet shops, nursing Homes, auto workshops, small scale industries and dairies
(E)

 

Factories / Industries Proof of occupancy: Attested copy of ration card/Election card/any other valid document Attested affidavit as per prescribed proforma Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney Attested copy of Trade License for repairing/ manufactur- -ing unit Attested copy of Factory / Industry License
(F)

 

Sewer Connection to Group Housing Societies/ Group Housing Pockets/ Commercial Centers/ Hotels/ Institutional Areas for sewer connection in plot size of more than 500 sqr. mtr. & above.

The Developing Agencies, before laying of sewer services, are required to get the sewerage scheme approved from the planning circle of the Delhi Jal Board located at Varunalaya Phase-I, Jhandewalan, Karol Bagh, New Delhi-110005.

  1. The Sewerage scheme is to be submitted in five sets through layout approving authority along with the hydraulic calculations and other details as under: -

  HYDRAULIC CALCULATIONS: -

  1. S.No.
  2. Reference line
  3. Length (Mtrs)
  4. Average Sewage Generation
  5. Peak Sewage Discharge
  6. Sub Soil Infiltration
  7. Total Discharge
  8. Diameter (mm)
  9. Gradient
  10. Capacity
  11. Initial Point-G.L.
  12. Initial Point-I.L.
  13. End Point-G.L.
  14. End Point-I.L.

 

  1. After scrutiny of the scheme by Planning Circle, approval is conveyed to the developing agency indicating size of sewer connection with G.L. I.L. and connection level at the receiving Manhole of the Delhi Jal Board, Sewer Line, to be made by the developing agency.
  2. The approval is conveyed within 20 days of deposit of proportionate charges if any.
  3. On approval of the scheme by the Planning Circle, the Applicant is required to apply for sanction of sewer connection in the office of Zonal Engineer (Civil) Sewer of the area.
  4. The sewer connection shall be sanctioned within 30 days.
  5. The developing agency is required to lay and maintain the connection and conveyance sewer line upto the Delhi Jal Board manhole/line.


3. DEVELOPMENT CHARGES
(A) RATE OF SEWERAGE DEVELOPMENT CHARGES:

Delhi Jal Board charges sewerage development charges from Unauthorized/Regularized colonies where sewer system has been laid by DJB. However, In village’s bonafide residents of Lal Dora extended area of Lal Dora are exempted from paying the Development Charge. Rate of Sewer development charge for colonies notified during notification period are as under:-

For Colonies Notified prior to 06.12.1999, Sewerage development charges is based on Date of Notification Rate per Sq. mtr. of the plot area
w.e.f. 02.04.1987 Rs. 45.00 with 12% compound interest
w.e.f. 01.11.1990 Rs. 55.00 with 12% compound interest
w.e.f. 05.04.1994 to 05.12.1999 Rs. 100.00 with 12% simple interest
w.e.f. 06.12.1999 to 31.03.2005 Rs. 160.00 alongwith rebate of 50% and 45% for plot size upto 100 Sq.m. and plot size above 100 Sq.m. respectively subject to payment in lump-sum upto 31.03.2006 +12% penal interest in rate every subsequent year w.e.f. 01.04.2006
w.e.f.  01-04-2005 to 31-03-2006 Rs. 179/-
w.e.f.  01-04-2006 to 31-03-2007 Rs. 200/-
w.e.f.  01-04-2007 to 31-03-2008 Rs. 224/-
w.e.f.  01-04-2008 to 31-03-2009 Rs. 224/-
w.e.f.  01-04-2009 to 31-03-2010 Rs. 300/-
w.e.f.  01-04-2010 to 31-05-2011 Rs. 369/-
w.e.f.  01-06-2011 to 31-03-2012 Rs. 455/-
w.e.f.  01-04-2012 to till date Rs. 494/-


(B) INFRASTRUCTURE CHARGES:-
Infrastructure charge’ are levied on the developing agencies as well as on the individual owner of plot/property size of 200 square meters or more at the time of approval of water/sewer schemes as per the procedure and by the authority as prescribed in Annexure-II of schedule-III for loading additional burden on the system of the Board. It is calculated on the average daily 
Demand of water in liters. Currently, the charges are Rs.48.20/- per liter. However, in case a new building is constructed with four storeyed or on plot size of 200 sq. mtr. Or more, the old connection will not be reopened without payment of Infrastructure Charges.

(C) USUAL CHARGES PAID FOR SEWER CONNECTION: - PLEASE REFER ANNEX. - II OF SCHEDULE -I OF REGULATION.
(D) ADDRESS & LOCATION OF ZRO/ZE OFFICE: - CAN BE SEEN UNDER WATER SECTION.
(E) Always take services of trained licensed plumber while connecting sewer to board line/ main hole.
Please refer your New KNO if applicant is having water connection in the property for which sewer connection in being sought.

4. ATTENTION OF CONSUMER WHEN LAYING SEWER CONNECTION
(A) REGULARISATION OF UNAUTHORISED SEWER CONNECTION

The consumer will have to pay enhanced penalty / charge together with cumulative sewer charges for 3 years as under: -

 
I. Penalty of Rs.500 per unauthorized sewer connection.
II. Sewer charges as applicable from time to time from respective categories for last three years.
III. Development charges whenever applicable will be recovered in installments.


(b) SOME DO'S & DON'TS FOR SEWER MAINTENANCE

DO's

Don'ts

  1. The entire sewage system should be properly ventilated.
  1. Do not dispose off paper and plastic waste in the sewer to avoid blockage.
  1. Joints of sewers should be made water tight, & should be properly checked so as to stop the leakage and dampness in the building.
  1. Never allow any clay, grit, sand, or 'Malva' to go into the sewer, as these things cause Sewer blockage.
Top